Electrical System Status on 30/12/2003 A- Steam Power Stations Power StationsFuel Use No. of UnitsNo. of Operating UnitsUnits LoadTotal Load MWRemarks123456DibisN.G4210/128-816No.1 prog maint. No.3 FDF25/1/04BaijiF.O62--80100-5/12180No.1Stopped at 24 hrs at 0050 leakage No 2 stopped at 350 low air flow No.5 Rehab. No.6 prog maint19/1/04DuraF.O4180---80No.4 leak in econom. No (5+6) Rehab.S. Bagh.F.O643525-301/1230120No.3 boiler leakage No. 5 prog maint.15/1/04MussaibeC.O + F.O43210150210570No.3 prog maint.18/12NassiryaC.O4213014528/12275No.3 leak in aux. stean. No.4 prog. maint.28/1/04NajebiaN.G + C.O21-3535No 4 boiler leak. No 5 one boiler HarthaN.G + C.O416023/1060No.4 Progr. maint. No 1 min . load 23/12 Total1336B – Gas Power Stations C – Hydro Power Stations Power StationsNo. of UnitsNo. of Operating UnitsStation load MW Fuel use Gas press RemarksPower StationsNo. of UnitsNo. of Operating UnitsStation load MWDischarge ‏M3/SBaiji21110G.ONo.2 . unsufic fuel.Musil Dam Main43390Quds22130G.O37 truckMusil Dam reg4330450Mosil12812530No.1 Rotor defec..No2 servo ACC. No.3 pearing mint. No 9 roter defectMusil Pumping21110Dibis313033No.(4+5). Rehab. No.6 Synch at 1810 in 28/12Haditha Dam62140300Old Mulla12580540No.1 ACC .gear No.2 servo N o 4 tripped at 2230 Vib No 5 prog main. No 6 Acc ger No 9 tripped at 725 HET No7 prog main No 12 Rehab Samarra3240350New Mulla6413534No. 5 prog .maint. No.6 Generator defect.Himrin212290Taji723420No.4 Turbine No.3 Compressor. No 5 pilot excit No 6 tripped at 0032 Aux.No.7 Rehab. Hindia444M. Taji21720No. 2 Software.Kufa4--Dura437521No.3 Rehab. Total926Hilla 4 4 70 34 System Generation = 79103 MWh Najaf 3 2 100 32 No.2 prog. maint. Syrian Line Generation = 891 MWh Khor43120NGNo.4 Rehab. Turkey line Generation = 1866MWhTotal Generation = 81860MWhShuaiba2--NG No 1 S/BSystem peak Load = 3414MWM. Shuaiba 2 - - NG Split with refinary Syrian Line Peak Load = 10 MW Petro 4 1 - NG Turkey Line Peak Load = 78 MW M. Dibis 4 2 7 NG Total Peak Load = 3502 MW Mossil East 5 4 15 G.O Equv. Peak load = 3502+1600+315=5417 MW Hmam + Zafranya 7 2 3 GO Baghdad Load = 1520 MW Diesel Sets Sets 5 GO Total 1046 NG: Natural Gas FO: Fuel oil CO: Crude oil Start End D.G Mohsen T. Hassan Gas press: Natural Gas GO: Gas oil FO: fuel oil CO: Crude oil ‏Programmed maint.