DAILY POWER SYSTEM HIGHLIGHTS FOR APRIL 7, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Haditha-Baghdad West 400 Kv Transmission line energized, expect power flow within one week. Loss of 105 Mw of power daily due to Natural Gas Pressure low at Taji (3 units), and Doura (3 units). We will continue to see decreased power as we enter into the spring maintenance period. Generation: Peak Power 3830Mw, 73,559Mw hours, 7-day Avg. 3733Mw Generators Returned to Service: Mussaibe #1 now producing 200 Mw 15 Mw Mosil 10 15 Mw Generators Unscheduled Out of Service (20) 413 Mw PLANT Type SP, CP, RP, HP Fault Mw * Dibis 2 SP Excitor Problem 8 South Baghdad 5 SP Drum Level Low 30 South Baghdad 6 SP Boiler Leak 30 * Baiji Mobile, 1,2,3,4 CP No Fuel 100 Mosil 1 CP Rotor Defect 15 Doura 1 CP Natural Gas Pressure low 15 * Doura 2 CP Natural Gas Pressure low 15 Doura 4 CP Natural Gas Pressure low 15 * Hilla 5 CP Testing 20 Mosil 2 CP Hydraulic Pressure Low 15 Mosil 3 CP Servo 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 * Old Mulla 3 CP Primary Protector 15 Old Mulla 5 CP Primary Protector 15 Old Mulla 6 CP High exhaust temperature 15 Old Mulla 8 CP Vibrations 15 Taji 2 CP Turbine temperature 15 Taji 3, CP Compressor 15 M. Taji 2 CP Software 15 RED – Denotes out of service since last report Generators Scheduled Out of Service (27) 1918 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 1 SP M TBD 21 Mar 04 21 May 100 Baiji 3 SP M Bechtel 29 Feb 04 1 May 100 Dibis 4 SP M ME 15 Mar 04 30 Apr 8 Doura 3 CP R GRD/RIE 1 Mar 03 TBD 20 Doura 3 SP M ME 18 Mar 04 18 May 65 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 20 Jun 100 Doura 6 SP R Bechtel Jul 03 20 Jul 100 Dibis 4 CP R GRD/RIE Sep 03 12 May 30 Hartha 1 SP M ME 22 Mar 04 23 May 100 Khor Zubayr 1 CP M ME 4 Apr 04 TBD 50 Khor Zubayr 2 CP R GRD/RIE 15 Mar 04 15 Jun 50 Mosil 11 CP M ME 2 Apr 04 TBD 15 Mussaibe 2 SP M ME 28 Feb 04 28 Apr 200 Mussaibe 4 SP M ME 7 Feb 04 30 Apr 200 Nassirya 1 SP M ME 30 Mar 04 15 May 130 Nassirya 2 SP M ME 9 Mar 04 15 Apr 150 Nassirya 3 SP M ME 31 Mar 04 15 Apr 130 Nassirya 4 SP M ME 31 Mar 04 15 Apr 130 New Mulla 6 CP R GRD/RIE 28 Mar 04 15 May 30 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Shuaiba 1 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 3 SP R ME 18 Mar 04 18 May 20 Taji 7 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 6 CP M ME 2 Apr 04 TBD 15 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 26 May 102 towers complete/212req’d Haditha-Baghd West 400 Sabotage GRD/RIE 15 Apr 246 towers complete/246 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE Complete MoE completing PLC work Baiji - Baghd West #1 400 Sabotage GRD/RIE Complete In service 31 March Baghd E.-Baghd S. #2 400 New Line GRD/RIE Complete 81 towers complete/81req’d Haditha – Qaim 400 Sabotage GRD-RIE TBD No contract awarded Baiji – Haditha 400 Sabotage Bechtel TBD No contract awarded Diyala Connection 400 New Line ME 30 May Dibis/Erbil-Qara Qosh 132 New Line GRD/RIE 15 May Contractor mobilized Dibis to Old Kirkuk 132 Reconductor GRD-RIE 15 Jun Bids for work under evaluation Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME Complete 44 towers complete/44 req’d Samediya – New Baghdad 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Jazair to Yarmook 132 Reconductor GRD-RIE 15 Jun Contract Awarded 24 Mar Baghd West – Jamia 132 Sabotage ME TBD Al Amarah-Burzulgan 132 Looting GRD-RIE 15 Jun 26 towers complete /126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: Distribution: Power transferred from North to Middle 1170 MW. Power transferred from South to Middle -180 MW. GOVERNORATE Peak Load MW MWH Average Load MW Demand Load MW Baghdad 1250 26621 1109 1433 Duhok 82 1951 81 110 Naynawa 325 7708 321 504 Tamim 125 3093 129 176 Salah Aldeen 190 4705 196 245 Anbar 210 4540 189 238 Dyala 70 2039 85 134 Babil 130 2596 108 140 Kirbala 125 2214 92 99 Najaf 145 2633 110 123 Kadsya 65 1470 61 82 Wasit 88 2022 84 114 Muthana 60 1364 57 73 Nasirya 100 2218 92 119 Misan 65 1457 61 81 Basra 320 7516 313 313 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3