# ورقة1 DATE: 9 / 1 / 2004 POWER STATION UNITS CONDATION DURING MAIN PEAK LOAD AT : 18:30 HRS 1 2 3 4 5 6 7 8 9 10 11 12 INST. CAP. AVAIL CAP. PEAK LOAD DAILY PROD. DBSP F 8 F 8 60 16 16 338 BAJP 100 F F 95 P F 1320 195 195 5790 BGSP 25 F 30 30 F 25 355 110 110 2520 DORP 80 F P P 640 80 80 1895 MUSP 200 F 180 200 1200 580 580 14084 NSRP 150 140 125 P 840 415 415 11103 HRTP 140 P 400 140 140 3334 NJBP 40 85 200 125 125 2928 TOTAL STEAM 5015 1661 1661 41992 GAS 1 2 3 4 5 6 7 8 9 10 11 12 MSLG F F F 13 13 13 13 12 F 12 12 12 200 100 100 3021 MSLEM F 6 F F F 40 6 6 110 DBSG F P 23 112.5 23 23 680 DBSM 3 3 3 F F 50 9 9 63 TAMG F F 13 13 F 14 P 14 13 13 12 F 220 90 90 2244 NTAMG 30 30 30 F F P 222 90 90 2412 TAJG 15 15 F F 15 15 120 60 60 1474 TAJM 9 F 24 9 9 146 DORG 25 25 F 25 150 75 75 1536 HILG 18 18 17 17 80 70 70 1559 NJFG 50 P 50 189 100 100 2341 QDSG 110 110 246 220 220 5118 KAZG 40 40 40 F 252 120 120 2970 SHBG+ DISEAL (2*6) 7 F 40 7 7 170 HMAM F F 5 0 0 7 BAJG 135 S 318 135 135 3244 PETG F 10 F F 80 10 10 240 ZAFR+ SHOM+ DIZEL 10 10 10 60 TOTAL GAS 2348.5 1134 1134 27395 HYDRO 1 2 3 4 5 6 7 8 9 10 11 12 MDM 130 P 130 130 750 390 390 6142 MDR 11 P 12 12 60 35 35 927 MPS 110 S 240 110 110 298 KADH F S 70 S P 70 660 140 140 2393 HMRH P 22 50 22 22 521 SMRH 17 16 S 84 33 33 770 HNDBH 1.5 1.5 1 1 15 5 5 120 KUFH S S S S 5 0 0 0 DOKH 400 DRBH 166 TOTAL HYDRO 2430 735 735 11171 ZHUR 0 0 0 TURK.LINE 80 80 1910 TOTAL 80 80 1910 TOTAL GEN. 9793.5 3610 3610 82468 1 # ورقة2 ELECTRICITY PRODUCTION STATUS IN MW DATE:9/ 1 / 2004 REGION INSTALLED AVAILABLE GENERATION EXPORTED IMPORTED RECCOMMENDATION CAPACITY CAPACITY CAPACITY NORTH 4163.5 1316 1316 450 REGION MIDDLE 3818 1477 1477 REGION SOUTH 1812 817 817 170 REGION TOTAL 9793.5 3610 3610 BAGHDAD = 1500 MW MAIN ACT . PEAK LOAD = M.P LOAD + L.SH + F.D 5485 MW = 3610 MW + 1550 MW + 325 MW Eng. ABDUL HAFOUD HUSSEIN DAOUD Eng. THAIR .E. YACOOUB Director Head OF Planing And Tracing DIRECTOR OF NATIONAL DISPACH CENTER Eng. MAHDI DAHAM JASSIM Eng. SALAH NASIR HASSON Director Head OF Operational Study Dept Director Head OF Operational Dept 2 # ورقة7 DATE :9 / 1 / 2004 N GOV. Average planned load (MW) Average supplied load (MW) Deviation 1 BAGD 1800 1294 506 2 DOHK 110 78 32 3 NYNW 514 313 201 4 TAME 185 129 56 5 SLAH 237 183 54 6 ANBR 221 168 53 7 DYLA 132 71 61 8 BABL 129 77 52 9 KRBL 96 68 28 10 NAJF 119 92 27 11 WAST 117 76 41 12 KADS 88 54 34 13 MUTH 70 48 22 14 THQR 127 112 15 15 MYSN 72 56 16 16 BASR 321 304 17 5