# A-Steam Power Stations REPORT DATE - DECEMBER 2003 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 1 0 0 0 8 8 24 No.1 mnt 10 DEC to 25 JAN. No. 3 tripped 1715 FWP. No. 2 FWP. Baiji Fuel Oil 6 3 0 85 85 100 0 0 270 500 No. 5 rehab. No. 6 mnt 5 DEC to 19 JAN. No. 1 tripped at 726 A/H. Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4 Mnt 10 OCT to 12 DEC. Nos. 5 & 6: Rehabilitation. South Baghdad Fuel Oil 6 1 35 0 0 0 0 0 35 200 No. 6 mnt 11 NOV to 26 DEC. No. 5 mnt 1 DEC to 15 JAN. No. 2, 3 and 4 boiler leakage. Mussaibe Crude and Fuel Oil 4 2 200 0 0 200 400 860 No. 3 program mnt 3 NOV to 18 DEC. No. 2 problem in sealing. Nassirya Crude 4 3 145 145 0 110 400 600 No. 3 mnt 11 NOV to 11 DEC. No. 4 synch 1401 11 DEC. Najebia Natural Gas and Crude 2 1 0 90 90 160 No. 4 mnt 4 NOV to 22 DEC. Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 4 Mnt from 23 OCT to 23 DEC. Total: 1428 2824 # B- Gas_C-Power Stations Report Date- 12 DECEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 110 125 Gas Oil Musil Dam Main 4 3 390 600 Quds 2 1 112 160 Gas Oil 51 trucks. Musil Dam reg 4 3 35 60 450 Mosil 12 7 115 150 33 No. 1 rotor defect. No. 2 ACC. No.3 and 8 program mnt. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 26 No. 4, 5& 6 rehab. Haditha Dam 6 2 150 160 400 Old Mulla 12 8 120 128 510 No. 1 gas control. No. 2 servo and C/B. No. 5 Programmed Mnt. No. 12 rehab. No. 6 tripped at 1920 HET. Samarra 3 2 41 55 410 New Mulla 6 4 140 173 3.6 No. 6 Generator Defective. No. 3 Mnt. Himrin 2 1 20 21 75 Taji 7 2 33 55 20 No. 5 flame. No.7 Rehabilitation. No. 2 mnt. No. 4 generator look out. No. 3 rotor. Hindia 4 4 4 5 85 M. Taji 2 0 0 20 0 No. 1 and 2 software. Kufa 4 0 0 1 0 Dura 4 3 75 30 19 No.3 Rehabilitation. Total 640 896 Hilla 4 4 70 64 34 System Generation 71615 MWh Najaf 3 2 98 129 32 No. 2 program mnt. Syrian Line Generation 1248 MWh Khor 4 2 110 80 Natural Gas No. 4: Rehabilitation. No. 1 VIB. Turkey Line Generation 601 MWh Shuaiba 2 0 0 20 Natural Gas No. 1 oil leak. No 2 tripped 304 VIB. Total Generation 73464 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3266 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 20 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 30 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3393 MW Total 993 1233 Baghdad Load 1350 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads GOVERNORATE Peak Load MW MWH Average Load MW 12 DECEMBER, 2003 Baghdad 1350 15 Power transferred from North to Middle 700 MW. Duhok 30 15 Naynawa 241 15 Power transferred from South to Middle 200 MW. Tamim 110 15 Salah Aldeen 150 15 Anbar 170 15 Dyala 50 15 Babil 78 15 Kirbala 60 15 Najaf 75 15 Kadsya 50 15 Wasit 75 15 Muthana 45 15 Nasirya 115 15 Misan 60 15 Basra 300 15 2959 MWH not provided by Ministry of Electricity