DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 25, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Hartha 4 and Old Mulla 10 returned from programmed maintenance and fully operational. Generation: Peak Power 4292Mw, 91,101Mw hours, 7-day Avg. 4171Mw Generators Returned to Service 215 Mw Hartha 4 150 Mw Mosil 7,8 30 Mw Old Mulla 10 15 Mw Doura 4, CP 20 Mw Generators Unscheduled Out of Service 858 Mw 876 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 4 SP Boiler Leak 8 South Baghdad 4 SP Boiler Leak 30 South Baghdad 5 SP Boiler Leak 30 South Baghdad 6 SP Boiler Leak 30 Mussaibe 1 SP Boiler Leak 200 Nassirya 3 SP Turbine Controls 165 Baiji 2, CP Lubricating oil leak 110 Qudis 2 CP Fuel level low 80 Hilla 1 CP Cooling System problems 20 Hilla 2 CP Servo 20 Mosil 1 CP Rotor Defect 15 Mosil 9 CP Rotor Defect 15 * Mosil 12 CP Generator fault 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo 15 * New Mulla 5 CP Inlet Gate Valve (IGV) 30 New Mulla 6 CP Generator Defect 30 Taji 3, CP Compressor 15 Taji Mobile, 2 CP Software problem 15 * RED – Denotes out of service since last report Generators Scheduled Out of Service 816 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 4 Mar 100 Doura 2 CP M ME 21 Feb 04 TBD 20 Doura 3 CP R GRD/RIE 1 Mar 03 15 May 20 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 30 Apr 100 Doura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME 30Dec 03 31 May 8 Dibis 4 CP R GRD/RIE Sep 03 30 Mar 18 Khor Zubayr 2 CP M ME 19 Feb 04 TBD 50 Mussaibe 4 SP M ME 7 Feb 04 7 Mar 180 New Mulla 2 CP M ME 17 Feb04 TBD 30 Old Mulla 5 CP M GRD/RIE 1 Nov 03 15 May 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 15 May 15 Taji 7 CP R GRD/RIE 1 Oct 03 TBD 15 Shuaiba 1 CP M ME 14 Feb 04 31 May 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May 102 towers complete/211req’d Haditha-Baghd West 400 Sabotage GRD/RIE 20 Apr 45 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE 7 Mar 287 towers complete/297 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 14 Mar 68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE 28 Feb 81 towers complete/81req’d Baghd S. – Diwaniyah 400 Sabotage GRD/RIE Compl. 24 Jan 27 towers complete/27 req’d Haditha – Qaim 400 Sabotage ME TBD No contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 New Line ME 30 Apr Dibis/Irbil-Quarqush 132 New Line GRD/RIE 15 May Contractor on-site 20 Feb Mosul – Mosul East 132 Sabotage ME TBD Shuwaiba-Toba-Hamar 132 Sabotage ME 28 Feb 43 towers complete/43 req’d Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 May 26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date - 25 FEBRUARY 2004 Power transferred from North to Middle 810 MW. Power transferred from South to Middle 215 MW. GOVERNORATE Peak Load MW MWH Average Load MW Baghdad 1400 29415 1226 Duhok 53 1517 63 Naynawa 350 8242 343 Tamim 145 3442 143 Salah Aldeen 220 4630 193 Anbar 185 4246 177 Dyala 111 2244 94 Babil 106 2529 105 Kirbala 137 2793 116 Najaf 137 3063 128 Kadsya 46 1344 56 Wasit 95 1946 81 Muthana 60 1374 57 Nasirya 120 2749 115 Misan 75 1405 59 Basra 335 7512 313 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3