# A-Steam Power Stations Report Date - 19 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 1 8 8 24 #2 boiler leakage; #3 prog maint; #4 boiler leakage Baiji Fuel Oil 6 4 95 85 75 85 340 500 #2 prog maint; #3 synch at 2144; #5 forced outage; #6 synch at 521 Daura Fuel Oil 4 1 75 75 180 #4 prog maint; #5 & #6 rehab South Baghdad Fuel Oil 6 2 20 30 50 200 #1 & #2 prog maint; #5 stopped at 411 a/h; #6 thrust bearing test Mussaibe Crude and Fuel Oil 4 2 200 200 400 860 #1 synch at 1030, stopped at 2117 e.h.g.; #4 prog maint. Nassirya Crude 4 3 155 170 150 475 600 #1 cond cleaning Najebia Natural Gas and Crude 2 2 90 90 180 160 Hartha Natural Gas and Crude 4 1 130 130 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1658 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations Report Date - 19 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 120 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 560 600 Quds 2 2 85 160 Gas Oil 31 trucks Musil Dam reg 4 3 28 60 1000 Mosil 12 9 129 150 18 #1 rotor defect; #3 synch at 710; #4 synch at 1425; #6 synch at 1450; #11 synch at 710 Musil Pumping 2 1 110 0 Dibis 3 2 53 30 27 #4 rehab Haditha Dam 6 2 125 160 350 Old Mulla 12 7 95 128 410 #1 acc. Gear; #2 servo; #5 prog maint; #10 prog maint; #12 needs rehab Samarra 3 2 40 55 440 New Mulla 6 3 105 173 2.7 #1 & #2 prog maint; #6 generator defect Himrin 2 2 42 21 160 Taji 7 4 60 55 19 #3 compressor; #7 needs rehab Hindia 4 4 5 5 100 M. Taji 2 1 8 18 19 #2 software Kufa 4 0 Daura 4 1 20 30 18 #3 needs rehab; #4 g.p.l. Total 910 896 Hilla 4 2 33 64 34 #1 cooling sys prob; #2 servo System Generation 82746 MWh Najaf 3 2 95 129 32 #2 test Syrian Line Generation 1265 MWh Khor 4 2 90 80 Natural Gas #2 oil leak; #4 stopped at 1720 test Turkey Line Generation 2036 MWh Shuaiba 2 1 5 20 Natural Gas #1 prog maint Total Generation 91474 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3866 MW Petro 4 1 10 0 Natural Gas Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 17 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 4272 MW Diesel 51 Gas Oil Baghdad Load 1535 MW Total 988 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads Report Date - 19 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 820 MW. Power transferred from South to Middle 250 MW. Baghdad 1535 31968 1332 Duhok 80 1954 81 Naynawa 350 7898 329 Tamim 165 3447 144 Salah Aldeen 200 4754 198 Anbar 195 4344 181 Dyala 95 2259 94 Babil 97 2459 102 Kirbala 110 2120 88 Najaf 120 2505 104 Kadsya 78 1428 60 Wasit 107 2011 84 Muthana 65 1293 54 Nasirya 127 2732 114 Misan 77 1426 59 Basra 335 7390 308