DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 20, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Generation: Peak Power 4282Mw, 89,959Mw hours, 7-day Avg. 4271Mw Generators Returned to Service 290 Mw Mussaibe 1 190 Mw Mosil 4, 8 30 Mw Doura 4, CP 20 Mw Khor Zubayr 2 50 Mw Generators Unscheduled Out of Service 686 Mw 876 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 2 SP Boiler leak 8 Dibis 4 SP Boiler Leak 8 South Baghdad 5 SP Air Heater 30 South Baghdad 6 SP Thrust bearing test 30 Nassirya 1 SP System Cleaning 130 Baiji 1 CP Line Trip 85 Baiji 2, CP Lubricating oil leak 110 Hilla 1 CP Cooling System problems 20 Hilla 2 CP Servo 20 Khor Zubayr 4 CP Testing 50 Mosil 1 CP Rotor Defect 15 * Mosil 3 CP Over Voltage 15 Mosil 7 CP Gas Pressure Low 15 Mosil 9 CP Rotor Defect 15 * Mosil 12 CP Over Voltage 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo and Circuit breaker 15 New Mulla 2 CP Maintenance 30 New Mulla 6 CP Generator Defect 30 Taji 3, CP Compressor 15 Taji Mobile, 2 CP Software problem 15 * RED – Denotes out of service since last report Generators Scheduled Out of Service 961 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 4 Mar 100 Doura 3 CP R GRD/RIE 1 Mar 03 1 Jun 20 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 30 Apr 100 Doura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME 30Dec 03 15 Feb 8 Dibis 4 CP R GRD/RIE Sep 03 30 Mar 18 Hartha 4 SP M ME/Bechtel 23Oct 03 23 Feb 150 Mussaibe 4 SP M ME 7 Feb 04 7 Mar 180 Najaf 2 CP M GRD/RIE 5 Dec 03 30 Apr 50 New Mulla 1 CP M GRD/RIE 13 Jan 04 1 Jun 30 Old Mulla 5 CP M GRD/RIE 1 Nov 03 1 Jun 15 Old Mulla 10 CP M GRD/RIE 6 Jan 04 1 Jun 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 1 Jun 15 Taji 7 CP R GRD/RIE 1 Oct 03 TBD 15 Shuaiba 1 CP M ME 14 Feb 04 TBD 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May 102 towers complete/211 req’d Haditha-Baghd West 400 Sabotage GRD/RIE 22 Mar 41 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE 29 Feb 278 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 5 Mar 68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE 20 Feb 81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME TBD No contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 Sabotage ME 30 Apr Mosul – Mosul East 132 Sabotage ME TBD Dibis/Irbil-Azadi/Quarqush 132 New Line GRD/RIE 1 Jun Shuwaiba-Toba-Hamar 132 Sabotage ME 15 Feb 43 towers complete/43 req’d Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 May 26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date - 20 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 805 MW. Power transferred from South to Middle 200 MW. Baghdad 1555 Duhok 85 Naynawa 345 Tamim 130 Salah Aldeen 200 Anbar 195 Dyala 100 Babil 108 Kirbala 135 Najaf 145 Kadsya 75 Wasit 95 Muthana 60 Nasirya 125 Misan 61 Basra 310 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3