# A-Steam Power Stations REPORT DATE -28 NOVEMBER 2003 A - Steam Power Stations Power Stations Type No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load Remarks Fuel 1 2 3 4 5 6 MW Dibis Natural Gas 4 2 0 0 8 8 16 24 No. 2 FWP. No.1 loss of flame. Baiji Fuel Oil 6 4 100 85 95 0 0 80 360 500 No. 5 rehab. No. 4 stopped boiler leak 0934. Dura Fuel Oil 4 1 75 0 0 0 75 180 No. 4: Programmed Maintenance10 OCT to 25 NOV. Nos. 5 & 6: Rehabilitation. South Baghdad Fuel Oil 6 1 0 0 30 0 0 0 30 200 No. 6 programmed mnt 11 NOV to 26 DEC. No. 4 and 5 stopped boiler leak. No. 1 stopped 1251 fuel pump. No. 2 stopped 1133 fuel pump. Mussaibe Crude and Fuel Oil 4 1 0 0 0 200 200 860 No. 2 program mnt 20 OCT to 12 NOV prob in field breaker. No. 3 program mnt 5 NOV to 20 DEC. No. 1 tripped 0002 boiler leak. Nassirya Crude 4 3 150 140 0 100 390 600 No. 3 programmed mnt 11 NOV to 11 DEC. No. 4 expan. Najebia Natural Gas and Crude 2 1 0 90 90 160 No. 4 programmed mnt 6 NOV to 21 DEC. Hartha Natural Gas and Crude 4 1 150 0 150 300 No. 4 Programmed Maintenance from 23 OCT to 23 DEC. Total: 1311 2824 # B- Gas_C-Power Stations Report Date- 28 NOVEMBER 2003 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 115 125 Gas Oil No. 1 s/b. Musil Dam Main 4 2 200 600 Quds 2 2 80 160 Gas Oil 44 trucks. Musil Dam reg 4 3 35 60 450 Mosil 12 7 105 150 16 No. 1 rotor defect. No. 2 ACC. No. 8 program mnt. No. 3 control cards. No. 5 stopped at 2330. Musil Pumping 2 0 0 0 Dibis 3 0 0 60 32 No. 5 problem turbine rotor. No. 6: Programmed Maintenance. No. 4 rotor defect. Haditha Dam 6 2 120 160 300 Old Mulla 12 7 88 128 20 No. 1 gas control. No. 2 gen protec. No. 5 Programmed Mnt. No. 12 rehab. No. 6 gene. Prot. Samarra 3 3 51 55 475 New Mulla 6 3 100 173 21 No. 6 Generator Defective. No. 4 cooling fan. No. 3 prog. Mnt. Himrin 2 1 22 21 90 Taji 7 5 80 55 13 No. 5 Diesel. No.7 Rehabilitation. Hindia 4 4 5 5 140 M. Taji 2 0 0 20 0 NGPL Kufa 4 0 0 1 Dura 4 1 12 30 15 No.3 Rehabilitation. No. 1 control. No. 4 tripped at 0001 NGPL. Total 433 896 Hilla 4 4 65 64 26 System Generation 65846 MWh Najaf 3 3 120 129 24 Syrian Line Generation 0 MWh Khor 4 1 40 80 Natural Gas No. 4: Rehabilitation. No. 2 tripped at 0507 over speed. No. 3 tripped at 0333. Turkey Line Generation 2061 MWh Shuaiba 2 1 10 20 Natural Gas No. 1 Programmed Maintenance. Total Generation 67907 MWh Petro 4 1 10 0 Natural Gas System Peak Load 3243 MW M. Dibis 4 0 0 24 Natural Gas Syria Peak Load 0 MW Mossil East 5 0 0 15 Gas Oil Turkey Peak Load 90 MW Hmam 2 0 0 Gas Oil Fixed Gen Peak Load 77 MW Total Peak Load 3410 MW Total 825 1233 Baghdad Load 1300 MW Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads GOVERNORATE Peak Load MW MWH Average Load MW 28 NOVEMBER, 2003 Baghdad 15 Power transferred from North to Middle 770 MW Duhok 15 Naynawa 15 Power transferred from South to Middle 120 MW Tamim 15 Salah Aldeen 15 Anbar 15 Dyala 15 Babil 15 Kirbala 15 Najaf 15 Kadsya 15 Wasit 15 Muthana 15 Nasirya 15 Misan 15 Basra 15 0 No data provided for governorates.