# A-Steam Power Stations REPORT DATE - 10 FEBRUARY 2004 A - Steam Power Stations Power Stations Type Fuel No. of Units No. of Operating Units Units Load (MW) Total Load MW Target Load MW Remarks 1 2 3 4 5 6 Dibis Natural Gas 4 2 8 8 16 24 #2 boiler leakage; #3 prog maint Baiji Fuel Oil 6 2 85 85 170 500 #1 stopped at 222 boiler leakage; #2 prog maint; #5 forced outage; #6 insulation test Daura Fuel Oil 4 0 180 #3 stopped at 314 boiler leakage; #4 rotor repair; #5 & #6 rehab South Baghdad Fuel Oil 6 2 20 30 50 200 #1 H.O. leakage; #2 air heater defect; #5 a/h; #6 boiler leakage Mussaibe Crude and Fuel Oil 4 3 190 200 200 590 860 #4 prog maint Nassirya Crude 4 4 125 160 170 150 605 600 Najebia Natural Gas and Crude 2 2 45 90 135 160 #4 synch at 1907 Hartha Natural Gas and Crude 4 1 140 140 300 #4 prog maint Out of Service for Unscheduled Maintanence Total: 1706 2824 Out of Service for Program Maintanence/Rehab No activity Not Performing at Peak Performance # B- Gas_C-Power Stations REPORT DATE - 10 FEBRUARY 2004 B- Gas Power Stations C -Hydro Power Stations Power Stations No. of Units No. of Operating Units Station Load Target Load Fuel Use Remarks Power Stations No. of Units No. of Operating Units Station Load Target Load Discharge m3/Sec Gas Pressure Baiji 2 1 125 125 Gas Oil #2 lub oil leak from bearing Musil Dam Main 4 4 570 600 Quds 2 2 210 160 Gas Oil 28 trucks Musil Dam reg 4 4 40 60 1000 Mosil 12 9 140 150 18 #1 rotor defec; #3 bleed valve; #9 rotor defect Musil Pumping 2 1 110 0 Dibis 3 2 25 30 30 #4 & #5 rehab Haditha Dam 6 2 120 160 250 Old Mulla 12 7 95 128 470 #1 acc. Gear; #2 servo; #5 prog maint; #10 prog maint; #12 needs rehab Samarra 3 2 42 55 420 New Mulla 6 3 100 173 2.8 #1 prog maint; #4 servo; #6 generator defect Himrin 2 2 35 21 130 Taji 7 5 65 55 18 #3 compressor; #7 needs rehab Hindia 4 4 5 5 M. Taji 2 18 #2 software Kufa 4 1 1 0 Daura 4 3 50 30 18 #3 needs rehab Total 923 896 Hilla 4 3 45 64 32 #2 servo System Generation 82430 MWh Najaf 3 2 100 129 31 #2 prog maint Syrian Line Generation 1330 MWh Khor 4 3 130 80 Natural Gas #4 rehab Turkey Line Generation 1994 MWh Shuaiba 2 1 6 20 Natural Gas #2 s/b Total Generation 91181 MWh M. Shuaiba 2 Natural Gas split with the refinery System Peak Load 3866 MW Petro 4 0 Natural Gas #2 stopped at 1843 Syria Peak Load 60 MW M. Dibis 4 3 9 24 Natural Gas Turkey Peak Load 80 MW Mossil East 5 3 17 0 Gas Oil Fixed Gen Peak Load 266 MW Hmam/Zafranya 7 2 3 Gas Oil Total Peak Load 4272 MW Diesel 40 Gas Oil Baghdad Load 1550 MW Total 1160 1186 Notes: Prepared from data submitted by D.G. Mohsin T. Hassan (1 (914) 360 6590). Edited by Electricity Commission U.S. Advisor Staff. # Peak Loads REPORT DATE - 10 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 780 MW. Power transferred from South to Middle 200 MW. Baghdad 1550 29243 1218 Duhok 80 1882 78 Naynawa 340 8955 373 Tamim 130 3815 159 Salah Aldeen 197 5172 216 Anbar 185 4427 184 Dyala 100 2351 98 Babil 105 2516 105 Kirbala 87 2147 89 Najaf 115 2521 105 Kadsya 55 1522 63 Wasit 85 2364 99 Muthana 55 1335 56 Nasirya 130 2717 113 Misan 65 1517 63 Basra 330 7290 304