DAILY POWER SYSTEM HIGHLIGHTS FOR FEBRUARY 17, 2004 The CPA Electricity Advisor issues this report to note significant events or conditions of interest in the power sector. The basic daily data on the power system is available on the CPA web site. HIGHLIGHTS: Khor Zubayr 4, out of Programmed Maintenance, operational now. Generation: Peak Power 4266Mw, 89,315Mw hours, 7-day Avg. 4311Mw Generators Returned to Service 335 Mw Khor Zubayr 4 55 Mw Baiji 4, SP 80 Mw Mussaibe 2 200 Mw Generators Unscheduled Out of Service 811 Mw 876 Mw PLANT Type SP, CP, RP, HP Fault Mw Dibis 2 SP Boiler leak 8 Dibis 4 SP Boiler Leak 8 * Baiji 3 SP Control valve closed 80 South Baghdad 5 SP Steam Leak 30 * South Baghdad 6 SP No Signal 30 Nassirya 1 SP System Cleaning 130 Baiji 1 CP Line Trip 85 Baiji 2, CP Lubricating oil leak 110 * Qudis 2 CP Fuel Shortage 75 Doura 4 CP Gas Pressure Low 20 Hilla 1 CP Cooling System problems 20 Hilla 2 CP Servo 20 Mosil 1 CP Rotor Defect 15 Mosil 3 SP Gas Pressure Low 15 Mosil 4 SP Gas Pressure Low 15 Mosil 8 SP Gas Pressure Low 15 Mosil 9 CP Rotor Defect 15 Old Mulla 1 CP Acc Gear 15 Old Mulla 2 CP Servo and Circuit breaker 15 * New Mulla 2 CP Maintenance 30 New Mulla 6 CP Generator Defect 30 Taji 3, CP Compressor 15 Taji Mobile, 2 CP Software problem 15 * RED – Denotes out of service since last report Generators Scheduled Out of Service 961 Mw PLANT Type SP/NG Prog. Maintenance(M) / Rehab (R) Maint. Org. Date out-of -service Est. In-service Date Mw Baiji 2 SP M Bechtel 2 Jan 04 4 Mar 100 Doura 3 CP R GRD/RIE 1 Mar 03 1 Jun 20 Doura 4 SP M ME 2 Feb 04 20 Apr 65 Doura 5 SP R Bechtel Jul 03 30 Apr 100 Doura 6 SP R Bechtel Jul 03 31May 100 Dibis 3 SP M ME 30Dec 03 15 Feb 8 Dibis 4 CP R GRD/RIE Sep 03 30 Mar 18 Hartha 4 SP M ME/Bechtel 23Oct 03 14 Feb 150 Mussaibe 4 SP M ME 7 Feb 04 7 Mar 180 Najaf 2 CP M GRD/RIE 5 Dec 03 30 Apr 50 New Mulla 1 CP M GRD/RIE 13 Jan 04 1 Jun 30 Old Mulla 5 CP M GRD/RIE 1 Nov 03 1 Jun 15 Old Mulla 10 CP M GRD/RIE 6 Jan 04 1 Jun 15 Old Mulla 12 CP R GRD/RIE 1 Oct 03 1 Jun 15 Taji 7 CP R GRD/RIE 1 Oct 03 TBD 15 Shuaiba 1 CP M ME 14 Feb 04 TBD 20 South Baghdad 1 SP M ME 12 Feb 04 12 Apr 30 South Baghdad 2 SP M ME 12 Feb 04 12 Apr 30 LEGEND OF ELECTRICAL SYSTEM POWER SOURCE SP: STEAM POWER – These plants use either fuel oil or crude in burners CP: COMBUSTION POWER RP: RECIPROCATING POWER HP: HYDRO POWER Transmission: LINE Kv Fault Maint. Org. Date out-of -service Est. In-service Date Comments Nassiriya-Khor Zubayr 400 Sabotage Bechtel 1 May 102 towers complete/211 req’d Haditha-Baghd West 400 Sabotage GRD/RIE 22 Mar 41 towers complete/236 req’d Hartha-Qut – Wasit 400 Sabotage GRD/RIE 29 Feb 278 towers complete/293 req’d Baiji - Baghd West #1 400 Sabotage GRD/RIE 5 Mar 68 towers complete/68 req’d Baghd E.-Baghd S. #2 400 New Line GRD/RIE 20 Feb 81 towers complete/81 req’d Haditha – Qaim 400 Sabotage ME TBD No contract awarded Baiji – Haditha 400 Sabotage ME TBD No contract awarded Diyala Connection 400 Sabotage ME 30 Apr Mosul – Mosul East 132 Sabotage ME TBD Dibis/Irbil-Azadi/Quarqush 132 New Line GRD/RIE 1 Jun Shuwaiba-Toba-Hamar 132 Sabotage ME 15 Feb 43 towers complete/43 req’d Baghd West – Jamia 132 Sabotage ME TBD Omara-Burzegan 132 Looting ME 1 May 26 towers complete/126 req’d Temim- Tuz 132 Sabotage ME TBD Nejibiya – Hartha 132 Sabotage ME TBD Lines Returned to service: None reported today Distribution: Report Date - 17 FEBRUARY 2004 GOVERNORATE Peak Load MW MWH Average Load MW Power transferred from North to Middle 810 MW. Power transferred from South to Middle 240 MW. Baghdad 1500 31691 1320 Duhok 82 1922 80 Naynawa 360 9070 378 Tamim 150 3287 137 Salah Aldeen 220 5127 214 Anbar 240 4304 179 Dyala 125 2204 92 Babil 95 2350 98 Kirbala 85 1710 71 Najaf 92 2190 91 Kadsya 55 1383 58 Wasit 90 1924 80 Muthana 65 1326 55 Nasirya 120 2834 118 Misan 70 1396 58 Basra 355 7542 314 Data compiled and reported by: LTC Tharnell M. Thomas CENTCOM LNO CPA Ministry of Electricity thomast2orha.centcom.mil Page PAGE 1 of NUMPAGES 3