Mobile Communications Tender
Questions and Answers
Revised
August 9, 2003
The following questions have been presented to MoTC since the tender offer regarding the tender or specific aspects of the tender for the mobile communications network. Names of those submitting questions have been removed and only generic information is provided in order to preserve the transparency of this tender. A running list of the questions will be provided as they are received and addressed by the CPA.
Added on August 9,
2003
Q77. Employment restrictions.
While it is established policy and demonstrated practice to recruit a local
workforce, the situation in Iraq requires expatriate staff to build and operate
the business and to train local staff.
[company] would reserve the right to retain expatriate workers in Iraq
for the duration of the license.
A77. Though there will not be restrictions on
employment for the duration of the license, employment generation for Iraqis;
use of Iraqi contractors and suppliers; and introduction of new technology will
be preferred.
Q76. Exchange rates and
controls?
A76. To the extent possible, we would require minimal exchange controls including a fast track procedure if controls exist; there is no control on exchange rates nor do we expect such controls in the future.
Q75. Restriction on
repatriation of profits or capital for foreign investors?
A75. Given the magnitude of investment required to build and operate a mobile communications network, we would require minimal constraints; the CPA is looking at introducing policies and procedures designed to help facilitate economic growth and encourage foreign direct investment (FDI). Iraq does not currently restrict the repatriation of profits nor do we expect to in the future.
Q74. Will import duty, taxes or
any other fees to be levied on import of handsets and infrastructure? We would
require confirmation that all sanctions to the country – including those
imposed by the US – have been lifted.
A74. Sanctions have been lifted. Import restrictions, duties and taxes have as an interim measure been lifted until 31 Dec. To help encourage foreign direct investment, we are looking at low and competitive duties and taxes for foreign investors to ensure a supportive and competitive environment for foreign investment.
Q73. Will there be a stable and
clear tax regime that results in a competitive tax burden on commercial
profits?
A73 . CPA will encourage the Iraqi Interim Authority to employ open and transparent policies including those concerning the tax regime. Iraqi authorities are currently considering incentives such as tax breaks to encourage foreign direct investment.
Q72. The bidders are required to build into the
price of the business package 100 minutes per month of roaming in neighboring
countries. Is it terminating or
originating minutes?
A72. Originating.
Q71. Which "neighboring countries"
should bidders include in their subscriber package costing for business
customers?
A71. Bidders may use the countries of their choice.
Q70. Does the 24-month license term run from
license grant or service launch?
A70. License grant.
Q69. Bidders must submit a list of five broadly
similar licenses or contracts. What is
meant by "contracts" in this context?
A69. These licenses, or contracts, will be used to validate the bidder’s ability to provide the stated services should they win the license. The licenses, or contracts, should be existing agreements between the bidder and other licensing authorities. Most will be licenses to operate.
Q68. Is it possible that the license term could
be extended beyond the 24-month period?
A68. See paragraph 51.
Q67. What will occur if a future Iraq Authority
has not been established by the end of the license period?
A67. The alternatives will be considered at that time.
Q66. Can a bidder be awarded more than one license?
A66. The intention of this request for bids is to award three licenses to three separate licensees.
Q65. What is meant by a "license
agreement"? Will the successful
bidder be awarded an administrative license or enter into a form of contractual
agreement with the CPA?
A65. The successful bidders will be licensed to install and operate a mobile network.
Q64. Who will monitor and enforce license terms
(who acts as regulator, when/how will it be constituted, what will its scope of
regulation be etc.)?
A64. CPA.
Q63. How is geographic coverage measured? Is it just cell coverage as percentage of
geographic area? What are the
associated coverage metrics in terms of required signal strength?
A63. Geographic coverage should be reported in terms of cell coverage as a percentage of geographic area, however, this implies the area covered meets quality of service standards.
Q62. To what extent will failure to meet quality
of service or coverage requirements be excused where such failure is due to
security issues or lack of available power sources or other causes outside the
licensee's control?
A62. Consideration will be given for circumstances beyond a licensee’s control, however the general build-out and quality of service metrics will be seriously considered.
Q61. What is the penalty for failing to meet
quality, service and coverage obligations? Is license revocation a sanction of
"last resort" only?
A61. The CPA will consider all of the circumstances in determining failure to requirements.
Q60. Are all frequencies offered in Blocks A to
C in the three regions currently available and free from interference? If not, when are they expected to be so?
A60. The only currently authorized uses of Blocks A, B, and C are MTC, MCI, and the three local operators in the northern region. The CPA will manage the spectrum so as to ensure appropriate access. Any unauthorized user will be terminated.
Q59. Are licensees only offered
"national" licenses if the 12-month build-out target is met in all
listed cities/municipal areas?
A59. The 12 month target must be proposed by the bidder and agreed to by the CPA. It is for the bidder to decide its preferred build program which may or may not cover all the listed areas.
Q58. In what circumstances would a second
operator be offering services in the licensed region during the first 12 months
of service? (Refer to paragraph 7 of the Statement of Objectives.)
A58. Alternative services may be provided nationally, if a licensee meets it 12-month build-out objectives early.
Q57. If an Iraq Authority is established during
the term of the license, what guarantee is given that Order 11 and the terms of
the license will be respected and upheld for the remainder of its term?
A57. See paragraph 54 of the tender.
Added on August 8,
2003
Note: Two new documents that changed the conditions on the statement of objectives were released on August 8, 2003. These changes may be seen on this web page.
Q56. In the bid
document, one of selection criteria is "Maximum Number of Simultaneous Subscriber Calls". Typical GSM
provisioning would use Erlang B table to
generate the aggregate average erlangs
available according to the number of total physical timeslots over the whole network. Does this requirement ask for the total number of physical timeslots or the total erlangs?
A56. The answer should be provided in actual user time slots and
not in average expected traffic load; hence, the question asks for total call
number capacity.
Q55. What is the meaning of “start of installation within 20 days”?
A55. It is expected that a licensee will begin a reasonable effort at physical construction and/or network implementation within 20 days of license award.
Q54. Will there be any taxes,
Business, Corporate, VAT, etc.?
A54. Tax policies are currently under review with an eye towards incentives to promote investment.
Q53. The Bid Rules do not provide for any easement rights or rights of
way. If bidders are going achieve a
rapid roll-out, would it be advisable for the CPA to provide for broad easement
rights over government property?
A53. Easement rights and rights of way must be resolved with the appropriate landowners.
Q52. The Bid Rules do not specify how disputes between operators (both
ITPC and the other mobile operators) and other parties (e.g., land owners)
would be resolved.
A52. Within the guidelines of current Iraqi law, CPA law, and the licensee granted, the CPA will endeavor to resolve all appropriate issues.
Q51. Are any individual permits (e.g. build permits, RF permits) going
to be needed for individual base stations?
A51. The license granted for construction and operation of the mobile communications system will include licensing provisions for the use of the radio frequencies. Any construction or building permits that may be necessary must be coordinated on a tenant/landlord basis with the owner of the property where the facilities are to be located.
Q50. Section 13.5 of the Bid Submission Template requires that, with
respect to roaming arrangements, bidders detail “current network availability
by network”. It is unclear what this
means. We assume that it is likely intended to refer to the network coverage of
roaming partners but “availability” is normally associated with service levels
(e.g., blocked call rates) and not coverage.
Note that “service availability” is defined in the Bid Rules but
“network availability” is not. This needs to be clarified.
A50. Submission template item 10.5 states, “Current network availability by network.” This should be interpreted to mean the coverage area where current networks provided by the bidder are currently in operation.
Q49. The Bid Rules do not provide that the CPA will ensure that mobile
networks are provided with reasonable and non-discriminatory interconnection to
the other mobile networks. Will the CPA
intervene if mobile operators are unable to reach such an agreement?
A49. Paragraph 6 of the Statement of Objectives for Iraq Mobile License Offer, Revised, dated August 3, 2003, provides explicit guidance regarding the requirement to provide roaming with regional service licensees. Mutual agreements for roaming between regional providers are the responsibility of the licensees; however the SOO clearly requires that this capability be provided to subscribers in the region. If operators cannot resolve disputes, the CPA will intervene.
Q48. Paragraph 4 requires that each applicant bid for at least two
regions, but does not specify whether it is possible to state the preference of
the bidder and whether, if such a statement is allowed, the stated preference
will have any impact on the decision of the CPA. If, for example, a bidder were to rank first in respect of two
regions, how would the CPA determine which license to award to the bidder?
A48. Bidders are free to choose the regions where they prefer to bid and may state the desired region in their bid. The CPA will evaluate all bids and determine regional licensees on a best value basis.
Q47. How does the CPA intend to validate the requirement in paragraph
13 to submit “a list of 5 contracts or licenses broadly similar to those
offered through this process to demonstrate previous experiences”?
A47. The CPA intends to use these experience factors in verifying the bidder’s ability to satisfy the requirements of this tender.
Q46. Paragraph 6, which relates to national and international roaming,
needs to be clarified.
A46. Paragraph 6 of the Statement of Objectives for Iraq Mobile License Offer, Revised, dated August 3, 2003, provides explicit guidance. It states, “Licensees will be required to provide full national roaming services to their customers through agreements with the other two new regional licensees.” See question #2.
Q45. If a licensee meets its 12 month build-out
obligation in less than 12 months, would it then be granted a national license
at that time?
A45. Yes.
Q44. Can you release the contact information of the interested bidders?
A44. The
CPA does not maintain a list of potential bidders.
Q43. Is the CPA already planning to introduce additional licenses for
1800 MHz GSM, and for future migration to more advanced services?
A43. At present, the CPA is only allocating spectrum for the mobile cellular services as delineated in the 800 MHz and 900 MHz bands. It is anticipated that any further allocations will be consistent with ITU Region 1 allocations and future Iraqi government desires.
Q42. While there is no restriction on who can
apply for a license will there be restrictions on supply and import of
necessary and essential equipment?
A42. At present, there are no restrictions.
Q41. Given the short timeframes to build, will
the CPA guarantee equally short timeframes to source and import the required
equipment?
A41. Sourcing and importing of equipment necessary for a licensee to accomplish the build-out and service requirements are the responsibility of the licensee.
Q40. Is there a date after which questions are not going to be
accepted?
A40. The CPA will accept questions and strive to do its best in providing answers up to the bid submission date of 21 August.
Q39. Are there any restrictions on the equipment to be used in
building the network? Must be current
production? Have a lifecycle of 10
years? Not out of production?
A39. The equipment used by a licensee is the responsibility of that licensee. The operator is free to install, operate, and maintain any and all equipment necessary to provide acceptable quality of service communications to its subscribers.
Q38. Given the short timeframes to bring the network into service,
what type of assistance and guarantees will be available to operators and
suppliers? Approval of cell sites, quick
approval of plans, etc.?
A38. The CPA will not provide any oversight or approval of licensee installations. The locations and operations of these facilities will be by commercial arrangement with the tower owner or other facility owner.
Added on August 7, 2003
Q37. Is it possible or not for two applicants to
apply under one operator name for instance?
A37. Yes, this would be considered a consortium of the two parties. Only one license would be granted to a single legal entity assuming that the two parties met all of the eligibility rules.
Q36. Please clarify the time period over which
the package cost is to be specified. As an alternative, it could be considered
to request separate specification of one-time and monthly costs.
A36. Cost packages should be submitted that clearly depict the pricing plans available to consumers. This can be done with a structure that includes one-time costs as well as recurring monthly costs. Since most customers will pay on a monthly basis, this is the time frame that should be used for recurring costs, though bidders should specify if a longer term contract is required.
Q35. Is it correct to assume Calling Party Pays?
A35. For the time being and lacking a rule-based initiative that provides a basis for pricing, it can be assumed that the calling party pays rate structures are appropriate.
Q34.
According to Statement of Objectives, Annex B, subscriber packages shall
also be priced assuming a mix of GSM and CDMA. How does the CPA foresee this to be realized? What extra costs would
be reasonable to include (e.g., additional handsets)?
A34.
Bidders should consider the roaming requirements delineated in paragraph
6 and provide pricing that would accommodate the provision of dual-mode
handsets for those who require them.
Q33. According to Statement of
Objectives, paragraph 36, "ITPC will charge mobile operators 80 % of the
domestic call tariff rates". Is it
correct to assume that this is the rate for termination of mobile-originated
calls on the ITPC network?
A33. Yes.
Q32. According to Statement of Objectives,
paragraph 26, "Distress calls are to be handled by a Licensee provided
operator". Please clarify exactly
what this operator is supposed to do? Isn’t
there an emergency center to which calls can be routed?
A32. Licensees are required to provide connectivity to appropriate public safety and emergency response providers as necessary and available.
Q31. Could you please elaborate on your ideas
concerning an appropriate system of fines and penalties? What would be the exact
function of the performance bond in said system?
A31. The appropriate method and system for performance evaluation has not been established. Prior to license award, this system will be clarified and clearly articulated to award winners.
Q30. According to Statement of Objectives, paragraph
5, “Bidders will state their minimum build-out and service levels at 2 months,
6 months, …”. Is it correct to assume that these periods are relative to the
date of license award?
A30. Yes.
Q29. In footnote (3), are you referring to
megabits per second (Mbps)?
A29. Yes.
Q28. Regarding submission data file footnote (2),
which system are you referring to?
A28. This entry should reflect the total number of subscribers that may be using the system at one time as measured by the total number of subscribers who may access the network and maintain a completed connection at one time.
Q27. Regarding submission data file build-out
tables and footnote (1), is this information correct?
A27. Footnote (1) should be corrected to read, “Estimates are required for months 2, 6, 12, and 24.”
Q26. Reference submission data file items 17, 21,
22, 23, and 24, what is the meaning of these items?
A26. These items specifically request estimates of the percentage of customers who will have the service requested.
Q25. Reference submission data file item 19, the
definition of “dropped call” is missing from Annex A.
A25. The following definition should be added:
“Dropped Call Rate: The percentage of calls between any 2 locations (either mobile or fixed subscribers) which result in non-connection due to errors in the mobile communications network connection after an initial subscriber-to-subscriber connection has been made. Failures of the PSTN do not count towards this calculation. This is calculated during the busy hour and averaged over a 5 minute period of worst performance.”
Q24. Regarding submission data file items 14 and
15, are you referring to extra minutes or in general for any commercial plan of
the licensee?
A24. The intent of this item is to gauge the maximum cost per call of a subscriber using the bidder’s network to make a call originating on the network and terminating on the network of the provider.
Q23. Reference submission data file item 10, why
would you like to fix a maximum price [on cost of handset capable of
international roaming in Middle East countries] when handsets can include or
not include many other features rather than only the capability of
international roaming in middle east countries?
A23. The intent of this item is to gauge the anticipated cost of a handset that will have international roaming capability as a minimum. It is not intended to fix the price.
Q22. In submission data file items 4-9, what are
you referring to; monthly or annual fees and will the contracts have any
minimum duration or guarantees?
Q22. These items on the data file are for bidders to provide details of their proposed customer service plans in terms of cost and duration and other cost details.
Q21. In submission data file items 1-3, are you
referring to any companies in the consortium? To any subsidiaries? To any company belonging to the same group
in which any company of the consortium is present?
A21. The information requested in this item applies to each company participating in the bid, either individually or as a member of a consortium.
Q20. Would it be possible to get estimates of the
costs for tower space, rooftop space, fiber optic leases, and microwave links?
A20. We can only give figures for ITPC. ITPC is free to make commercial arrangements regarding these services with prospective bidders. We will endeavor to have any common rates, tariffs, or other information that ITPC wishes to make public available on the tender Internet page. However, all provision of services from ITPC should be arranged directly.
Q19. Are items 17 and 20 of the submission
template the same?
A19. Yes, this was an oversight on our part. Any additional information that a bidder wishes to include may be submitted as outside the page count, but will not be considered as part of the formal bid.
Q18. Do submission template items 18 and 19 refer
to consortium or to specific member companies?
A18. Submission template items 18 and 19 request company specific information and apply to all participants in the bid.
Q17. Please provide more detail for submission
template items 14 and 15.
A17. These items are intended for bidders to provide as complete information as possible on the network management plan and service plans that will be available to subscribers under the bidder’s proposed network.
Q16. What is the intent and purpose of item 10 on
the submission template?
A16. Items 9-11 are for bidders to detail a history, or record, of their services provided to date. In this context, item 10 requests information regarding provision of roaming services by the bidder in terms of networks, countries, technologies employed, and current availability.
Q15. Is the information requested in Submission
Template item 8.1 related to the Statement of Objectives paragraph 14?
A15. Yes, Paragraph 14 of the Statement of Objectives for Iraq Mobile
License Offer, Revised, dated August 3, 2003, provides explicit guidance regarding
the requirement to provide country specific and/or international tax or
business identification numbers.
Paragraph 8.1 is the location on the submission template for providing
this information.
Q14. Please clarify foreign investment
details.
A14. For the purposes of this tender and response, all foreign investments that are part of the financing arrangements for this bid or involvement of foreign entities in the project itself should be itemized.
Q13. What range of frequencies is available for
microwave transmission links between base stations and base station controllers?
A13. It is anticipated that sufficient capacity and locations are available for microwave links in the 14.4-15.3 GHz band. See question #4 for details on applying for microwave frequencies.
Added on August 6, 2003
Q12.
What is the official exchange rate for ID?
A12. All
bidders are reminded that all bid assessments should be submitted in US
dollars. For planning purposes, the
Ministry of Finance budget planning exchange rate is 1500 ID equal 1 US dollar.
Q11. What do you mean by de-confliction of
frequencies in Annex C, paragraph 7?
A11. Blocks
A and F overlap in the 880-890 MHz band.
The award of licenses to operate in this band will be dependent on
bidder requests for a frequency block and the geographic area associated with
the bid. This potential conflict in
frequency assignment will be resolve by the CPA during the evaluation of bids.
Q10. Are there any constraints related to change in
structure of the consortium or are the companies free to change the structure
in any moment?
A10. Paragraph
18 of the Statement of Objectives
for Iraq Mobile License Offer, Revised, dated August 3, 2003, provides
explicit guidance regarding transfer of the license. It states that the license may not be transferred, in whole or in
part, until the Ministry approves a written request. Any request for transfer of any form will not be considered until
after the 12 month build-out target of the original license has been met. Any proposed changes will also not be
accepted between submission of bids and the license award.
Q9. Please clarify the 10% restriction of the
government ownership in any bidding company.
A9. Paragraph 13 of the Statement of Objectives for Iraq Mobile License Offer, Revised, dated August 3, 2003, provides explicit guidance regarding government ownership restrictions. It states, “No government shall directly or indirectly own more than 10% of any single bidding company or single company in consortia. This is to be interpreted to mean that no government may own more that 10% interest in a bidding entity either directly or diluted ownership through a consortium. Thus any government participation is limited to 10% either as a primary bidder or as a partner in any one of the bidding partnerships.
Q8. During the conference, your delegation
indicated that the licensee would have the freedom to use whatever means to
connect internationally including providing satellite routes. There is no mention of this privilege in the
amended statement of objectives document and the Mandatory Technical
Requirements No. 21 says: International connectivity must be provided via ITPC
or other licensee provisions.
A8. Paragraph 21 of the Statement of Objectives for Iraq Mobile License Offer, Revised, dated August 3, 2003, provides explicit guidance regarding international connectivity. It states that international connectivity must be provided via the ITPC or “other licensee provisions”. This may be interpreted to mean that the licensee will be authorized to self-provide international connectivity.
Q7. We need a contact such as a helpdesk for
posting our questions to the ITPC. This is urgently required in order for us to
complete our business case considerations.
A7. The ITPC contact for this tender is Dr. Walid Jallo.
Q6.
What information should be included in the sections titled, 6)
Foreign Investment details, and 8) Details of project financial agreements.
A6. The MoTC has specified broad general requirements for submission of a bid. The specific submissions appropriate to an individual bidder are beyond the scope of this definition. Each bidder should strive to provide as much information as possible in order to have a complete application that can be verified and appropriate for this tender.
Q5. Will
there be any special access arrangements to the fiber system of ITPC for new
operators? Could they access to dark fiber? Who owns/controls the fiber network?
A5. The fiber
network in Iraq is owned and operated by the Iraq Telephone and Posts Company
(ITPC). All questions regarding access
to the fiber system and its use should be addressed to Dr. Walid Jallo. ITPC is 100% state owned and may not
unreasonably deny access to the fiber network.
Q4. Who manages the microwave spectrum?
Who does the operator apply to? Does any spectrum come with the license?
A4. Licenses
for the use of microwave connections and frequencies within Iraq will be
coordinated and licensed separately from this tender. These licenses will be administered through application to the
Ministry of Transportation and Communications (MoTC), ATTN: Mr. Fred Matos, and
coordinated with the Iraq Telephone and Posts Company (ITPC), ATTN: Dr. Nasi.
Q3. Referring to item 28 “Maximum power for transmitters”, included in the “Statement of Objectives for Iraq Mobile License Offer,” we have interpreted the imposed limit of 800 Watts EIRP for BTS as the maximum EIRP for a single transmitter (TRX) installed in a BTS. So that, as a GSM BTS may have a standard configuration for example of three sector with two transmitters for each sector, we assume that the maximum power for a single sector will be 2x800 Watts EIRP.
A3. Paragraph 28.3 of the Statement of Objectives for Iraq Mobile License Offer, Revised, dated August 3, 2003, provides explicit guidance regarding transmitter power. This guidance applies for each individual transmitter.
Q2. A
bidder proposing the use of GSM technology shall provide two sets of cost
figures.
1.1. Assuming GSM in all three regions
1.2. Assuming a mix of GSM and CDMA
Do we have to do both? It is currently unfeasible to have both
technologies operating in one handset, and to provide service in an area to do
both would require in essence building two complete systems. Please
clarify your meaning.
A2.
Paragraph 6 of the Statement
of Objectives for Iraq Mobile License Offer, Revised, dated August 3, 2003,
provides explicit guidance regarding licensee roaming requirements. A licensee must provide for the capability
for a subscriber to roam on either common regional networks or on national networks
as the subscriber may desire. This does
not mean that all subscribers must have the capability; it simply means that
the licensee must provide the capability to a subscriber who wishes the roaming
service. Dual mode GSM/CDMA handsets
are believed to be available.
Q1. A performance bond for the full value of the expected capital cost of network and infrastructure construction will be established. Does this mean we need to figure our CAPEX and provide a performance bond in this amount to CPA, what is the difference in a performance bond and letter of credit, and what is the minimum amount CPA is figuring for the performance bond? Can you please clarify to the best of your ability to include definitions of financial terms?
A1. Paragraph 17.1 of the Statement of Objectives for Iraq Mobile License Offer, Revised, dated August 3, 2003, provides explicit guidance. The paragraph states, “A performance bond for the full value of the expected capital cost of network and infrastructure construction will be established.” The total cost of the capital expenditure is expected to be entered into bond. A bond registered with a recognized and verifiable financial institution must be provided before a license will be issued.
Home |
Official Documents |
Press Releases |
Requests for Proposals/Solicitations
Ministries |
Daily Archives |
Contact Us |
Webmaster |
Privacy and Security Notice